From: Simulation and optimization of scrap wagon dismantling system based on Plant Simulation
Work process description | Process time (min) |
---|---|
Door removal | 30 |
Side plate end plate cutting | 112 |
Transfer between work processes | 2.9 |
Wagon separation | 11.4 |
Transfer between work processes | 4.8 |
Chassis flip | 14.4 |
Transfer between work processes | 3.6 |
Chassis cutting | 100 |
AGV loading and unloading time | 0.1 |