Table 2 Simulation parameter input

From: Simulation and optimization of scrap wagon dismantling system based on Plant Simulation

Work process description

Process time (min)

Door removal

30

Side plate end plate cutting

112

Transfer between work processes

2.9

Wagon separation

11.4

Transfer between work processes

4.8

Chassis flip

14.4

Transfer between work processes

3.6

Chassis cutting

100

AGV loading and unloading time

0.1