Skip to main content

Table 3 Work rate of each work station

From: Simulation and optimization of scrap wagon dismantling system based on Plant Simulation

Workstation name

Working (%)

Pausing (%)

Waiting (%)

Station

10.30

89.70

0.00

Station1

38.11

4.27

57.62

Station2

3.91

94.95

0.00

Station3

4.94

93.52

0.00

Station4

34.30

1.54

64.16